Below are cut n paste of some interesting bits of the Network Rail Strategic Business Plan
http://www.networkrail.co.uk/aspx/4357.aspxQuote
Date Service enhancement Infrastucture Enhancement Output
2012 12 car trains on c2c mainline Platform train dispatch equipment Increase in peak capacity
2012 12 car trains on Tilbury loop and Ockendon branch Platform extensions Increase in peak capacity
On the c2c route it is assumed that either additional 357 units will be ordered or that class317s will be cascaded from West Anglia. It is calculated that around 20 additional 4 car units will be required and calculations show that is space for berthing these trains at East Ham and Shoeburyness depots.
An option to improve line speed on part of the Thameside route, which could contribute towards additional capacity or improved performance, is currently being considered. Work on the business case indicates that this scheme will be worth pursuing and the project will be funded from the NRDF.
Platform lengths
It is generally accepted that the practical approach to continued passenger growth is the incremental lengthening of trains, especially as this solution is flexible, caters for the wide range of different growth scenarios and makes better use of scarce and high value paths.
c2c The key performance issues and opportunities for this route have been identified as
• accommodating more and longer freight trains associated with traffic growth from the port of Tilbury;
• improving the condition of the overhead line through campaign changes of expired components;
• reducing the impact of trespass, vandalism and fatalities;
• reducing the impact of cable theft, focusing on protection of the return conductor;
• initiation of a ‘Right Time Railway’ project focusing on sub-threshold delays, the 2nd largest cause of PPM failure;
• timetable review to cater for passenger growth, focusing on the Tilbury services and increasing seating capacity country side of Pitsea;
• faster repair of S&C; and
• improved protection of the 650v signalling supply which is prone to rodent damage in urban areas.
enhancements to be completed by end of current control period:
Date Project Description Output
2007/09 West Ham additional calls Alterations to signalling headways and check on station capacity Increased capacity
2007/09 Grays 8-car Bay Extend Grays Bay platform to 8-cars Relieves peak overcrowding and saves 2x8 car units. Reduces EC4T costs and improves performance
2007/09 linespeeds Improve speeds between Barking and Upminster Reduce journey time/ improve performance buffer
Proposed enhancements for control period 4
Date Project Description Output
2009-13 Power supply upgrade - Provide power supply to support longer trains and additional services
2012 Platform extensions on the Tilbury loop and Ockendon Branch 12 car platform extensions Improved capacity
2012 Platform equipment for longer trains Platform equipment to facilitate train dispatch Improve capacity and performance
2012 Minor power works Minor power upgrade Support capacity improvement
Candidate Schemes for Conrol period 4
2012 Ockendon Branch loop at Upminster Provision of loop Performance improvement
2012 Fenchurch St and Chafford Hundred Passenger circulation Improve circulation Capacity improvement
2010 Laindon improved access Additional access Capacity improvement
2012 Platform equipment for operation of longer trains Equipment to facilitate the dispatch of longer trains Capacity and performance improvement
2010 Shore supply to Shoeburyness depot Provide supply to depot when line is isolated Improve performance
Unquote
Seems to be good news all round - lets hope the proposals are fulfilled and the candidates elected! ie someone has the money to pay for all this